Developing a Plot with an Apartment Building: GFZ, Parking Spaces, Profitability

Whether a plot is suitable for an apartment building is decided jointly by building law and profitability. This guide shows with a transparent worked example how GRZ and GFZ determine the possible floor area, explains when an apartment building pays off instead of a detached or semi-detached house, sheds light on the perspective of owners and heirs of a plot and provides a feasibility checklist from development plan via development and parking spaces to the neighbourhood. As of 2026.

As of: 1. August 2026
Reading time: 11 Min.

Short answer: Whether a plot is suitable for an apartment building (Mehrfamilienhaus) is determined jointly by building law and economic viability. The site occupancy index (Grundflächenzahl, GRZ) and the floor space index (Geschossflächenzahl, GFZ) from the development plan (Bebauungsplan) define how much may be built. On an 800-square-metre plot with a GRZ of 0.4 and a GFZ of 1.2, roughly 320 square metres are buildable and around 960 square metres of floor space are permitted, as a rough estimate. The building authority has the final say. As of 2026.

GRZ
Site occupancy index
buildable proportion
GFZ
Floor space index
permitted floor space
800 m²
Example plot
rough calculation

GRZ and GFZ: a transparent calculation example

The permitted development of a plot is essentially determined by two key figures from the development plan. The site occupancy index (GRZ) indicates what proportion of the plot area may be built on. The floor space index (GFZ) sets the permitted floor space in relation to the plot area. The following example is approximate and serves only as guidance. The development plan and the information provided by the building supervisory authority are binding.

Rough GRZ/GFZ calculation example for an 800 m² plot (as of 2026). Guidance only, not binding.

VariableValue / assumptionResult (approximate)
Plot area800 m²starting value
GRZ0.4up to 320 m² buildable
GFZ1.2around 960 m² of floor space
Distributione.g. 3 full storeysfloor space per storey around 320 m²
Residential unitsdepends on the layoutto be planned per project

The development plan is binding

GRZ and GFZ only provide rough guidance. How many full storeys are permitted, which building height applies and how setback areas (Abstandsflächen) take effect are governed in detail by the development plan. An early preliminary building enquiry (Bauvoranfrage) creates legal certainty about the possible volume. The basics are explored in the guide on GRZ, GFZ and the building envelope.

When is an apartment building worthwhile instead of a detached house?

An apartment building is worthwhile above all where building law and plot size allow several residential units and the location suggests stable letting. If the development plan permits a higher floor space index, an apartment building makes more economical use of the plot than a detached or semi-detached house, because plot and site-development costs are spread across several units. Arguments against an apartment building include restrictive building law, a tight parking-space requirement, or a location with low rental demand.

Apartment building vs. single property on the same plot – neutral classification (as of 2026). No ranking.

CriterionApartment buildingDetached / semi-detached house
GFZ utilisationhigh with permitted densitylower
Costs per residential unitfall through distributionhigher
Parking-space requirementhigher, per residential unitlower
Managementcommercial operationminimal
Target groupinvestors, owners, heirsowner-occupiers

Owner and heir perspective: densifying a plot

Larger, already-developed plots in family ownership are often especially suitable for infill densification. An inherited plot can, for example, be used more efficiently by replacing an old building with an apartment building or by adding a new build at the rear. It is important to clarify ownership and inheritance relationships in advance, along with existing rights such as rights of way or utility easements, and the condition of the site development. Tax questions should be examined early on with professional advice. How to build on an inherited plot is explored in a dedicated guide.

Enquire about an apartment-building project – free & non-binding

From plot to permit: request a project-specific assessment and check what volume building law and economic viability allow.

Parking spaces and other building-law levers

The number of required parking spaces is set by the municipality via a parking bylaw or the state building code (Landesbauordnung), usually as a ratio per residential unit. The values differ by federal state and municipality and can be lower in well-connected inner-city locations than on the outskirts. The parking-space ratio has a noticeable effect on economic viability, because underground garages or parking areas tie up space and costs. We do not quote blanket values, because they are regulated at municipal level. The information provided by the local building supervisory authority is binding.

Feasibility checklist before purchase

Before buying or developing a plot, a systematic review is recommended. It helps to weed out unsuitable plots early, before planning costs arise.

  • Evaluate the development plan with GRZ, GFZ and the permitted number of storeys.
  • Clarify site development and connections for water, wastewater, electricity and roads.
  • Ask the municipality about the parking-space ratio and plan for the space required.
  • Estimate setback areas and possible shading of the neighbourhood.
  • Have ground conditions and possible contaminated sites checked.
  • Submit a preliminary building enquiry to clarify the permitted volume with legal certainty.

Use the plot check

A plot check bundles the most important points and provides an initial assessment of whether a plot is suitable for an apartment building. The assessment only becomes reliable with the development plan and official information for the specific plot.

Suitable layouts for later planning are shown by the apartment-building floor plans, while the page on the apartment building as a prefabricated house classifies the property type. The cost side of a property is explored in the guide on apartment-building prices. Which programmes support the construction of new rental housing is covered in the guide on apartment-building funding. All routes are bundled in the overview on the apartment building.

Check a plot for apartment-building suitability

One data set, several assessments: have building law, volume and economic viability checked on a project basis before you plan or buy.

What does your dream house really cost?

Request suitable quotes from vetted manufacturers for free and compare the prices per square metre for your construction project.

Compare house prices now

Important questions briefly explained

The most common price questions around Developing a Plot with an Apartment Building – answered concisely by the Prefabricated House editorial team (as of 2026).

How do I calculate how much I may build on a plot?
The permissible development is determined essentially by two key figures from the development plan: the site occupancy index GRZ and the floor space index GFZ. The GRZ states which share of the plot may be built over, the GFZ how much floor space is permissible in total. A simplified example: with an 800-square-metre plot, a GRZ of 0.4 and a GFZ of 1.2, arithmetically up to 320 square metres are buildable over and around 960 square metres of floor space are permissible. That is a rough orientation. Binding are the development plan and the information of the building supervisory authority.
What does GFZ 1.2 mean specifically?
The floor space index GFZ puts the permissible floor space in relation to the plot area. A GFZ of 1.2 means that the entire creditable floor space may amount to 1.2 times the plot area. With an 800-square-metre plot, around 960 square metres of floor space result thus, which distribute over several floors. How many storeys are actually possible depends additionally on the permissible number of full storeys, the building height and the separation areas. The GFZ is thus a central lever for the economic viability of a multi-family house, but does not replace the exact check of the development plan.
When is a multi-family house worthwhile instead of a single-family house?
A multi-family house is worthwhile above all where building law and plot size permit several residential units and the location lets a stable letting be expected. If the development plan allows a higher floor space index, a multi-family house uses the plot economically better than a single-family or semi-detached house because plot and development costs distribute over several units. Against a multi-family house speak restrictive building law, a tight parking-space key, difficult neighbourhood or a location with low rental demand. The decision falls always after a check of building law, economic viability and personal objective.
Can I build on an inherited plot with a multi-family house?
Frequently yes, provided that the development plan permits the corresponding density. Precisely larger, already developed plots in family ownership are often suitable for a densification, for example the replacement of an old building with a multi-family house or the supplement of a new building in the rear area. Important are beforehand the clarification of ownership and inheritance conditions, existing rights such as way or line rights as well as the state of the development. A building pre-enquiry creates early clarity about the permissible volume. Anyone who wants to build on an inherited plot additionally checks tax questions early with professional advice.
How many parking spaces do I need for a multi-family house?
The number of necessary parking spaces is determined by the municipality via a parking-space statute or the state building code, usually as a key per residential unit. The values differ per federal state and community and can turn out lower in well-developed inner-city locations than at the city edge. The parking-space key influences the economic viability noticeably because underground garages or parking-space areas bind area and costs. We name no blanket values because they are regulated municipally. Binding is the information of the local building supervisory authority, which one best obtains before the plot purchase or the planning.
How do I check the feasibility before the purchase?
Before the purchase or development of a plot, a systematic check is recommended: evaluate development plan with GRZ, GFZ and number of storeys, clarify development and connections, enquire the parking-space key at the municipality, estimate separation areas and shading to the neighbourhood and check soil conditions as well as possible contaminated sites. A building pre-enquiry at the building supervisory authority creates legal certainty about the permissible volume before planning costs arise. A plot check bundles the most important points and helps to sort out unsuitable plots early. Reliable the assessment becomes only with development plan and official information for the specific plot.
What happens if no development plan exists?
If a development plan is missing, the permissibility usually depends on whether the plot is located in the inner area of a built-up locality. Then a new building must fit by type and measure into the closer surroundings, which can limit height, number of storeys and density. In the outer area, residential construction is, by contrast, permissible only in narrow exceptions. Without a development plan, the estimation of the possible volume is clearly more uncertain, which is why an early building pre-enquiry is particularly important. The binding assessment is made by the building supervisory authority. Basics on GRZ, GFZ and building envelope ease the conversation with the authority.
TÜV Rheinland CERTIFIED – verified qualification, ID 0000038136

Personal qualification of our expert

Proven expertise

On your side: the expert team at Prefabricated House

Ihr TÜV-zertifizierter Fachmann rund um Fertighaus-Preise

  • TÜV Rheinland-certified qualification
  • Manufacturer-independent guidance
  • Certified expert
Meet the experts